Installation and Upgrade Guide for the Cisco Secure Access Control System 5.1
Index
Downloads: This chapterpdf (PDF - 154.0KB) The complete bookPDF (PDF - 5.76MB) | Feedback

Index

Table Of Contents

Numerics - A - B - C - D - E - F - G - H - I - K - L - M - N - O - P - R - S - T - U - V - W -

Index

Numerics

4-post hardware kit

rack-mount 4-3

4-post rack, mounting appliance on 4-2

A

acs deployment 1-1

adapter cards

troubleshooting A-4

airflow

guidelines 3-8

altitude

guidelines C-4

B

back panel 2-5, 4-7

LEDs 2-6

C

cable

connecting 4-7

management 4-11

troubleshooting A-4

checking

LEDs 4-13

checklist, installation 3-13

checklist, power up 4-12

configuration

site 3-8

connecting

cables 4-7

network interface 4-8

connections

troubleshooting A-4

considerations

power 3-9

console port, pinouts

serial 4-10

cooling system

troubleshooting A-3

corrosion

preventing damage C-2

CPI tool

identification 2-3, A-7

CSACS 1121 Series appliance

front view 2-4

D

dust

preventing damage C-4

E

electricity

safety with 3-3

electromagnetic interference

See EMI

electrostatic discharge 3-5

See ESD

EMI

preventing effects of C-4

environment

maintaining C-1

site 3-7

environmental

features A-3

specifications (table) 3-9

equipment

racks

rack-mounting 3-8

safety with 3-3

ESD

preventing damage C-4

preventing effects of 3-5, C-4

F

features

environmental reporting A-3

front panel

LEDs 2-4

troubleshooting A-5

front view

CSACS 1121 Series appliance 2-4

G

grounding (warning) 4-12

guidelines

airflow 3-8

lifting 3-5

rack installation 3-6

rack-mounting configuration 4-1

safety 3-1

temperature maintenance C-3

H

hardware

troubleshooting procedures A-1

humidity

maintenance guidelines C-4

I

identification

CPI 2-3, A-7

information packet and warranty 3-11

installation

checklist 3-13

verification 5-4

installing ACS server

setup program 5-2

post-installation tasks 8-1

K

kit

mounting 4-2

rack-mount hardware (table) 4-3

L

LEDs

back panel 2-6

checking 4-13

front panel 2-4

lifting guidelines 3-5

location

serial number 2-3, A-7

log, site 3-14, B-1

M

magnetism

preventing effects of C-5

maintenance C-1

temperature C-3

management

cable 4-11

method of procedures

See MOP

MOP 3-5, 3-10

N

network interface

connecting 4-8

NIC

LEDs

troubleshooting A-6

NIC 1 and NIC 2

RJ-45 pinout 4-9

O

overview

product 2-1

P

planning

site 3-6

post-installation tasks 8-1

power

considerations 3-9

power lines (warning) 3-3

power source interruptions

preventing damage from C-5

power supplies (warning) 3-3

power supply (warning) 3-3, 4-12

power system

troubleshooting A-3

power up

procedure 4-12

precautions

general precautions 3-2

problem solving

See troubleshooting

procedure

method of 3-10

power up 4-12

product

overview 2-1

R

rack

enclosed (do not use) 3-7

four-post (open) 3-7

rack, mounting on 4-post 4-2

rack installation

guidelines 3-6

rack-mount

4-post hardware kit 4-3

rack-mounting configuration

guidelines 4-1

radio frequency interference. See RFI

regulatory compliance 2-7

removing

CSACS 1121 Series appliance 4-15

restricted access (warning) 3-3, 3-6, 4-1

RFI

preventing effects of C-4

RJ-45 pinout

NIC 1 and NIC 2 4-9

S

safety

guidelines 3-1

SELV circuits (warning) 3-3

serial

console port, pinouts 4-10

serial number

location 2-3, A-7

site

configuration 3-8

environment 3-7

maintenance factors C-1

log 3-14, B-1

planning 3-6

requirement, MOPs 3-10

site log B-1

T

temperature

maintenance guidelines C-3

temperature and humidity guidelines 3-8

tools and equipment

required 3-12

trained and qualified (warning) 4-1

troubleshooting

adapter cards A-4

cables A-4

connections A-4

cooling system A-3

Ethernet LEDs A-6

front panel LEDs A-5

power system A-3

U

unpacking

checking shipment 3-10

upgrading

acs deployment 7-2

acs Monitoring and Report Viewer 7-9

acs server 7-10

post-installation tasks 8-1

V

VMWare

configuring 6-4

hardware requirements 6-1

installing 6-1

installing ACS server 6-8

W

warranty 3-11