Cisco Global Site Selector 4492R Hardware Installation Guide
Index
Downloads: This chapterpdf (PDF - 229.0KB) The complete bookPDF (PDF - 2.46MB) | Feedback

Index

Table Of Contents

A - B - C - D - E - F - H - I - L - M - N - O - P - R - S - T - U - W -

Index

A

AC electrical specifications     A-1

AC power     2-8

connecting     3-12

cord, connecting     3-12

line conditioners     5-5

power source interruptions     5-4

protection devices     5-5

receptacle     1-4

site installation preparation     2-8

uninterruptible power supplies     5-5

altitude, guidelines     5-2

audience     vii

B

booting the system     3-12

C

cable pinouts

RJ-45 to DB-25     1-6

RJ-45 to DB-9     1-6

cabling

cables, connecting     3-10

Category 5e cable     1-5, 3-11

general precautions     2-4

rear panel functions     1-4

requirements     1-5, 3-11

site preparation guidelines     2-8

troubleshooting connections     4-2

cautions, description of     ix

cleaning operating environment, guidelines     5-3

CLI

saving connection session     3-13

serial console connection, establishing     3-13

connections

cables     3-10

console port to modem     B-1

power     3-12

troubleshooting     4-2

console port

connections     3-11

description     1-5

establishing connection     3-13

location     1-4

modem, connecting     B-1

operating settings     1-6

pinouts     1-6

corrosion, preventing damage     5-3

D

damage to product, reporting     3-2

documentation

conventions     ix

related     viii

set     viii

dust, preventing damage     5-3

E

electrical specifications     A-1

electricity, safety precautions     2-4

electromagnetic interference

See EMI

electrostatic discharge, protecting against     2-5, 5-3

EMI, preventing effects of     5-3

environment, maintaining     5-1

environmental

site requirements     2-7

specifications     A-1

ESD, preventing damage     5-3

Ethernet interfaces

cabling requirements     1-5, 3-11

Category 5 UTP cable     3-11

connector pinout     1-5

description     1-5

Ethernet 0 connector     1-4

Ethernet 1 connector     1-4

Ethernet controller     1-5

specifications     A-2

F

four-post rack mount kit

installation instructions     3-2

front panel

features     1-2

illustration     1-2

H

hard drive

magnetism effects     5-4

hardware

features     1-2

troubleshooting     4-1

humidity guidelines     5-2

HyperTerminal

launching     3-13

saving session     3-13

I

ID button     1-3

installation

choosing a site     2-7

creating a safe environment     2-8

general precautions     2-4

network, setting up     2-10

precautions for rack-mounting     2-9

preparation for     2-1

preparing for

LAN options, precautions for     2-10

modems, precautions for     2-10

telecommunications, precautions for     2-10

required tools and equipment     2-10

site preparation     2-6

site requirements     2-6

tools and equipment required     2-10

unpacking and inspecting     3-2

L

LAN

options, precautions for     2-10

precautions     2-10

LED indicators

monitoring operating status     3-14

line conditioners, using     5-5

M

magnetism, preventing effects of     5-4

maintenance     5-1

modem

connecting to console port     B-1

precautions     2-10

N

network, physically removing an appliance     3-14

O

operating status, monitoring     3-14

P

physically removing an appliance from a network     3-14

physical specifications     A-2

port connectors     1-4

port specifications     A-2

power

AC power receptacle     1-4

connecting to system     3-12

power source interruptions, preventing damage     5-4

power button     1-3

power protection devices     5-5

power source interruptions     5-4

power supplies, using uninterruptible     5-5

power supply guidelines     2-8

R

rack mounting

four-post rack     3-2

identifying unit by System ID button     1-4

identifying unit by system ID button     1-3

installation considerations     3-3

precautions     2-9

radio frequency interference. See RFI

rear panel

connections     1-4

features     1-4

removing or replacing the appliance     3-14

RFI, preventing effects of     5-3

RJ-45 to DB2-5 cable pinouts     1-6

RJ-45 to DB-9 cable pinouts     1-6

S

safety

creating a safe environment     2-8

electrostatic discharge     2-5

general precautions     2-4

important safety instructions     2-2

installation     2-1

precautions with electricity     2-4

preventing EMI     2-6

safe environment, creating     2-8

warnings and cautions     2-1

with electricity     2-4

sensors

power supply guidelines     2-8

serial port

connection     3-13

description     1-5

location     1-4

pinouts     1-6

site

environment, maintenance factors     5-1

preparation     2-6

requirements     2-6

specifications     A-1

electrical     A-1

environmental     A-1

physical     A-2

port     A-2

starting the system     3-12

surge protectors, using     5-5

System ID button     1-4

system ID button     1-3

T

technical specifications     A-1

telecommunications, precautions     2-10

temperature guidelines     5-2

troubleshooting     4-1

basic checks     4-1

connections     4-2

switches     4-2

troubleshooting system hardware     4-1

U

uninterruptible power supplies, using     5-5

W

warnings

regarding

batteries and explosion danger     2-3

chassis, opening     2-2

chassis, working on     2-2

disposal of unit     2-3

explosion     2-3

faceplates and cover panels, removing     2-3

failure to ground equipment     2-3

ground conductor, defeating     2-2, 2-7

installation area     2-7

instructions, reading     2-3

jewelry     2-3

lightning activity     2-3, 3-10

On/Off switch     2-3

power cords, more than one     2-2

safety cover     2-2

short circuits     2-2, 2-8

translations of     2-2